Ground up mixed use. 32 Units. First floor retail.
Ground up mixed use. 40 units. 2 floors of Subterranean parking. First floor 4 restaurants.
USC construction of new student housing (total of 19 units) – ~21,000 SQFT
Ground up 16 unit apartment building.
Ground up multifamily project. Prefabricated modular pods.
43 Units ground up construction
26 Units ground up multifamily in construction
25 Units ground up construction
Full gut and build back with all new mechanical, electrical and plumbing (8 Units) – 7,532 SQFT
Cal State Fullerton construction of new student housing (total of 26 units)
New Commercial Ground Up Construction : Tierra Mia Coffee Shop and Drive Thru – 1,700 SQFT with 600 SQFT patio
US Army & Navy & Marines training facility – 6,000 SQFT
City of Long Beach repositioning – 15,000 SQFT Commercial
12 Units, full rehab, and full build back of all mechanical, electrical and plumbing
Tenant Improvement and build out of 5500 Sq ft third floor office space in a City of Beverly Hills owned building adjacent to the Montage Hotel.
Tenant improvement and build out of 12,500 sq ft restaurant and bar.
Ground up construction of a multi-tenant commercial building converted into 2 retail and 2 restaurant spaces.
Ground up construction of a 4500 sq ft restaurant built out with its own private parking lot for 20 cars.
New construction of 3 restaurant store fronts and 1 retail store front, approximately 6000 sq ft in total.
Rollout of patient safe handling systems at 12 facilities across South California, equaling a total of 980 ICU/NICU rooms.
Demo and construction of new quartzes wall paneling systems, video wall system, and specialty ceiling covering system at 15 locations across the Westcoast.
Installation of 1,500LF of Seamless Glass wall partitions and interior framing through campus.
Installation of structural framing supports for various architectural features and MEP’s.
New Patient Tower – Structural supports for all safe patient handling, operating rooms, medical equipment, and hybrid rooms.
Structural framing supports for all overhead medical equipment throughout new wing of tower.
8-unit residential complex, full rehab and build back of all framing, electrical, plumbing, and mechanical.
8,000 SQFT Luxury SFR House – Developer on new construction spec home for sale
Full gut and build back with all new mechanical, electrical and plumbing (12 Units) – 5,392 SQFT
3,500 SQFT SFR – Developer on new construction spec home for sale
Full gut and build back with all new mechanical, electrical and plumbing (9 Units) – 6,586 SQFT
6000 sq ft custom home build out in Bel Air
12,500 sq ft custom home build out in Bel Air
Ground up construction on single family home with 2 additional dwelling units in the back of the property.
The MID team understands that long term relationships are fundamental to the success of our business, and our clients are always our priority.